COMMUNITY-BASED PLAN
How
did we
get here?
The planning process has included assessing our facilities, working with staff, and engaging a community task force to determine priorities, needs and potential solutions. Findings from a September 2025 community survey guided the final plan proposed to voters.
What
is in the
plan?
Safety & Accessibility
Add secure entrance with office remodel and canopy
Add ADA ramp at front entrance
Add ADA access to toilet room
Buildings & Sites
Repair/replace aged flooring, walls, ceilings, casework, fixtures, and interior doors
Replace boilers
Upgrade electrical systems
Repair exterior masonry and cladding
Replace/repair aged exterior doors
Learning & Support Spaces
Add Kindergarten toilets
This referendum invests in securing our buildings, repairing what keeps them strong, and modernizing the spaces where students grow every day.
Below is a concept plan and list of the proposed improvements for each school.
Safety & Accessibility
Enhance entrance security with office remodel and add canopy
Add fire protection per code
Replace fire alarm
Add ADA access to toilet rooms
Buildings & Sites
Add new makeup air unit with cooling
in KitchenRepair/replace aged flooring, walls, ceilings, fixtures, and casework
Add dedicated IT Room and backup
Replace main entrance and sliding windows
Upgrade aged electrical equipment
Repair exterior masonry joints and sealants
Learning & Support Spaces
Add new 4K and Kindergarten classrooms
Replace portable classrooms with permanent general classroom addition
Create Special Education and Maker Space by reconfiguring classroom and corridor areas
Relocate Art and Music classrooms
Renovate Commons, Kitchen, and Serving areas
Safety & Accessibility
Add secure entrance with office remodel
Add fire protection per code
Replace fire alarm
Add ADA access to toilets
Buildings & Sites
Upgrade existing heating and chilled water system
Replace 1979 air handling units and add cooling
Add new makeup air unit with cooling in
KitchenAdd dedicated IT Room
Upgrade aged electrical equipment
Improve Courtyard drainage
Replace/repair aged flooring, ceilings,
fixtures, and exterior doorsRepair exterior masonry joints and
sealants
Learning & Support Spaces
Remodel classroom to include dedicated Special Education space
Expand Cafeteria and renovate Kitchen
Remodel Early Childhood area with toilets
Add new 4K classrooms and gymnasium
Remodel Library and Art Room
Safety & Accessibility
Add secure entrance and expand office to include student services
Add ADA access to toilet rooms
Buildings & Sites
Replace aged flooring, walls, ceilings, fixtures, and interior doors
Replace makeup air unit with cooling
in KitchenRepair exterior masonry and precast panels
Replace/repair aged windows and exterior doors
Reconstruct front drive
Replace or improve sidewalk
Replace track
Learning & Support Spaces
Expand Art Room
Remodel space to add a Social Studies/Health Classroom
Relocate and expand FACE Room
Relocate staff workroom/lounge near office and repurpose existing space for school store/café
Relocate and expand Kitchen/Serving with new
receiving area

